The university is in the process of getting started with the renovations to BH.
Burried in a facilites document there is a description of what we can expect to see:
Key objectives of proposed project:
Develop two new, level one “smart classrooms.
Develop Academic Success component on second level of addition.
Develop new lobby on north side of building to include improved “front” door and
display components for UNC Athletic History.
Remove portions of the existing CMU walls within the facility, in locations
identified on drawings. Install new CMU wall in existing portion of Butler
Hancock to allow reconfiguration of locker rooms and expansion of the current
Athletic Training room.
Install a second level in each of the two existing racquetball courts.
Resolve ADA accessibility issues.
Reconfigure existing general locker rooms, renovate and upgrade newly
assigned locker rooms to reflect current standards: carpet, wood lockers with
integral bench, full HVAC.
Provide new, larger staff locker rooms on second level.
A new electrical service and main distribution switchboard.
New lighting in remodeled and new areas.
To provide air conditioning for the proposed areas, a new chilled water system
will need to be installed.
In addition, the University is starting a fund raising campaign for the construction of a
Strength and Conditioning and Sports Medicine addition to Butler Hancock. The budget
for this portion of the project is approximately $7,400,000.
TOTAL PROJECT BUDGET: S11,591,235.
Burried in a facilites document there is a description of what we can expect to see:
Key objectives of proposed project:
Develop two new, level one “smart classrooms.
Develop Academic Success component on second level of addition.
Develop new lobby on north side of building to include improved “front” door and
display components for UNC Athletic History.
Remove portions of the existing CMU walls within the facility, in locations
identified on drawings. Install new CMU wall in existing portion of Butler
Hancock to allow reconfiguration of locker rooms and expansion of the current
Athletic Training room.
Install a second level in each of the two existing racquetball courts.
Resolve ADA accessibility issues.
Reconfigure existing general locker rooms, renovate and upgrade newly
assigned locker rooms to reflect current standards: carpet, wood lockers with
integral bench, full HVAC.
Provide new, larger staff locker rooms on second level.
A new electrical service and main distribution switchboard.
New lighting in remodeled and new areas.
To provide air conditioning for the proposed areas, a new chilled water system
will need to be installed.
In addition, the University is starting a fund raising campaign for the construction of a
Strength and Conditioning and Sports Medicine addition to Butler Hancock. The budget
for this portion of the project is approximately $7,400,000.
TOTAL PROJECT BUDGET: S11,591,235.