I agree, we could move the stadium track to the practice track location and as the stadium is being rebuilt use some of the old aluminum bleachers and press box at the new location. Have it seat 5,000 or so. We had how many Olympic and DI championships at the facility and how much $$ did those events render? Football is the macdaddy $ maker, turn old Hornet Stadium into Mattos House and build to 25K, expandable to 40K.
If Sac, UCFE and CP are all eventually in the WAC or some other FBS league together, Mattos House could theoretically sponsor an FBS bowl. Sellout if any of these three teams are represented. Plus Nevada, Fresno or SJSU.
2. At this point I really don't care what/where the design turns out to be as long as it has at least 4500 capacity and an upper concourse. A nice new arena would be nice, I just don't see how they could expand the Nest to reach 4500, plus it is in a very tightly developed area. But if that is what we have to do, so be it. I'd rather have the stadium built out while the momentum is on an upswing.
2a. Both of these plans need to be on the hot ticket at the CSU Regents and planning office. It will take eternity to have it rubber stamped and dirt broken.
3. Yes, attendance cures all problems.
4. Smith retired, Christianson hopefully can fare better. Need lights and press/concessions.
Let's all hope La Tech gets an invite to CUSA before 7/11. They announced yesterday that they are building a $20M addition to their stadium (locker, training, etc.) and $9M has already been donated. Ground broken soon.